The Commerce Control List order of review is the sequence BIS lays out in Supplement No. 4 to 15 CFR Part 774 for classifying items under the Export Administration Regulations (EAR). First you confirm the item isn’t on the U.S. Munitions List. Then you check the 600 series and 9×515 entries, then the rest of the Commerce Control List (CCL), applying “specially designed” as you go. Nothing matches? It’s EAR99.
Why a fixed order? Because CCL entries overlap. One part can look like it fits a military catch-all, a dual-use entry, and an anti-terrorism entry at the same time, and the sequence is what puts it in the entry BIS intends.
What is the Commerce Control List order of review?
It’s a published method, and BIS means for you to use it. The agency added it during export control reform, when many military items moved from the U.S. Munitions List (USML) into new CCL entries. Without a set sequence, two analysts could put the same part in different ECCNs and each think they’d gotten it right.
The short version:
- Confirm the item isn’t subject to the ITAR or another agency’s exclusive jurisdiction.
- Confirm the item is subject to the EAR under 15 CFR 734.3.
- Review the 600 series and 9×515 ECCNs.
- If none applies, review the rest of the CCL.
- Within any ECCN, prefer paragraphs that describe the item specifically over catch-all paragraphs.
- Apply the “specially designed” definition in 15 CFR 772.1 wherever the entry uses that term.
- If no entry describes the item, designate it EAR99.
Each step gets its own section below.
Step 1: Rule out the ITAR and other agencies
Jurisdiction comes first. Read the USML in 22 CFR 121.1 for any category that could cover your item. If the item matches an enumerated USML paragraph, or it’s a part or component “specially designed” for a USML article under the ITAR’s own definition, you’re looking at a defense article. The State Department’s Directorate of Defense Trade Controls (DDTC) controls it, and you stop.
A small set of items belongs to other agencies, such as certain nuclear items under the Nuclear Regulatory Commission. The jurisdiction call itself is covered in more depth in ITAR vs. EAR.
Step 2: Confirm the item is subject to the EAR
Being off the USML doesn’t automatically make an item subject to the EAR. 15 CFR 734.3(b) excludes several categories, among them published information and software, the results of fundamental research, and some educational information. Physical products are almost always in. Software and technology are where you’ll want to slow down.
Step 3: Review the 600 series and 9×515 entries first
The 600 series ECCNs have a 6 as their third character, as in 0A606 or 9A610. The 9×515 entries, such as 9A515, cover spacecraft and related items. Together they hold the military and space items that came over from the USML, and they tend to have broad license requirements and few license exceptions.
You start here because these entries are built to catch anything with a military or space connection before it slides into a lighter dual-use entry. Take a bracket designed for a military helicopter. You’d test it against 9A610 before looking at anything in Category 9 that controls commercial aircraft parts.
Their structure is worth learning. Paragraphs .a through .w usually list specific items. Paragraph .x catches parts, components, accessories, and attachments “specially designed” for listed items. Paragraph .y, where there is one, covers specific parts BIS decided need only light controls, mostly for anti-terrorism reasons, with extra restrictions for a few countries.
If an enumerated paragraph of a 600 series or 9×515 entry describes the item, classify it there. If only the .x catch-all does, run the “specially designed” analysis before you settle.
Step 4: Review the rest of the CCL
With no 600 series or 9×515 match, move to the rest of the CCL. Pick the categories that could cover the item, then the product groups that fit: A for equipment and components, B for test and production equipment, C for materials, D for software, E for technology.
Read each candidate entry in full, Related Controls, Related Definitions, and Technical Notes included. Then compare the item’s specs to the parameters in the items paragraphs. Most dual-use entries control items only above stated thresholds, so you’re really doing a run of yes-or-no checks against numbers.
What to pull from engineering, and how to search efficiently, is covered in how to find the ECCN for your product.
Step 5: Specific beats catch-all
When an item seems to fit more than one entry, the order of review breaks the tie. An entry or paragraph that describes the item by its own characteristics wins over one that controls it only because it’s “specially designed” for some other item. Put simply, a part named outright or described by its parameters goes to that entry, even if it’s also a part for something listed elsewhere.
Related Controls notes help too. Plenty of ECCNs say flatly that certain items are controlled under a different entry and send you there.
Step 6: Apply the specially designed definition
You’ll run into “specially designed” all over the CCL, and it has a precise meaning in 15 CFR 772.1. It works in two stages.
Paragraph (a): the catch
An item is caught if it meets either of two tests. One asks whether, as a result of development, the item has properties peculiarly responsible for achieving or exceeding the controlled performance levels or functions in the entry. The other asks whether it’s a part, component, accessory, attachment, or software for use in or with a commodity or defense article listed on the CCL or the USML.
Paragraph (b): the releases
An item caught by paragraph (a) gets released if it meets any one of six tests in paragraph (b). The releases people rely on most cover:
- Fasteners, washers, spacers, and similar basic hardware, regardless of form or fit
- Parts with the same function, performance capabilities, and form and fit as parts used in items that are in production and are not listed, or are listed only for anti-terrorism reasons
- Items developed with knowledge that they would be for use with both listed and unlisted items
- Items developed as general purpose commodities or software
Several of these turn on development records. BIS expects documents showing what the developer knew and intended, so if you’re claiming a release based on design intent, keep the evidence.
Work through it in order
Apply paragraph (a) first. If the item isn’t caught, it isn’t specially designed, and that catch-all doesn’t apply. If it is caught, test each paragraph (b) release, and write down which one you used and the facts behind it.
Step 7: EAR99 when nothing applies
If the item is subject to the EAR and no ECCN describes it after all this, it’s EAR99. That label still comes with license requirements for embargoed destinations, restricted parties, and prohibited end uses, which is why EAR99 doesn’t mean license-free.
How to document the review
Build your classification file in the same order. For each item, note the USML categories you checked and why they didn’t apply, the 600 series and 9×515 entries reviewed, the dual-use entries reviewed, the “specially designed” analysis with the release used, and the final result with the date and reviewer. Under the EAR’s recordkeeping rules in 15 CFR Part 762, export records generally have to be kept for five years, and this file backs up every shipment of the item.
If the item changes, redo the review. Because the sequence never changes, a new analyst can open an old file and see exactly where to look.
Want classifications an auditor can actually follow?
Our product classification service runs the order of review on your parts and assemblies and writes it up so an auditor can trace every step, “specially designed” releases included. If you need a process your own team can repeat, our consulting group can build the intake forms and review steps around it. Tell us what you’re classifying and we’ll suggest a starting point.
This article is general information, not legal advice. Check current BIS and DDTC guidance before acting.
Frequently asked questions
Where is the order of review found in the EAR?
It's in Supplement No. 4 to 15 CFR Part 774, the part of the EAR that contains the Commerce Control List. It sets out the sequence BIS expects exporters to follow: confirm jurisdiction, review the 600 series and 9x515 entries, then review the rest of the CCL, and apply the specially designed definition at each step.
Why do I start with the 600 series?
The 600 series and 9x515 ECCNs hold military and space items that moved from the U.S. Munitions List to the EAR. They carry tighter controls than most dual-use entries. Checking them first means a part designed for a military or space item gets caught by the right entry instead of drifting into a less restrictive one further down the list.
What does specially designed mean under the EAR?
Specially designed is a defined term in 15 CFR 772.1. Paragraph (a) of the definition catches items developed to achieve controlled performance or that are parts and components for use in a listed item. Paragraph (b) then releases items that meet one of six tests, such as standard fasteners or parts with the same form, fit, and function as parts used in uncontrolled items in production.
What if an item fits two ECCNs?
The order of review gives precedence to entries that describe the item specifically by its characteristics over catch-all entries that control it only because it's specially designed for something else. Related Controls notes inside each ECCN often point you to the right entry as well. If a real conflict remains, a BIS commodity classification request can settle it.
Is the order of review mandatory?
BIS presents it as the method exporters should use, and it's the method BIS itself applies. Skipping steps isn't a violation by itself, but a misclassification is. Following the order and documenting each step is your best evidence that you exercised care if a classification is ever questioned in an audit or enforcement case.